“Here, it is not only a question of greening or decreasing. We will correct the effects of the extension of the Paris agglomeration with a renaturation operation which is the high -end of ecological engineering. The Val-de-Marne prefect is impressed by the magnitude and technicality of the titanic site which began to Villeneuve-Saint-GeorgesIn The flood district of Blandin-Belleplaceon the edge of the Yerres.
Facing repeated floods – “There were 13 recognitions of natural disaster already,” said the mayor Kristell niasm (LR) -, the communities, agencies and state services found that it was impossible to maintain pavilions and inhabitants on this portion of the territory given the risks involved.